Bag Costing for PP Woven Sacks & Packaging
Bag costing is working out what one bag costs you to make — raw material plus process-wise conversion plus waste — before the quotation goes out. This page sets out the woven sack cost sheet line by line, the formula behind each line, a worked example, and what bag costing software has to do that a spreadsheet cannot.
What is bag costing?
Bag costing is the calculation that turns a bag specification into a cost per bag. A specification — size, mesh, denier, GSM, lamination, print, bottom type — decides how many grams of each material the bag consumes. Rates and process costs turn those grams into rupees. Everything else in a quotation, from margin to freight, sits on top of that one number.
It is worth being precise about the two figures people mix up. Cost per kilogram is what the market quotes and what a supplier price list carries. Cost per bag is what decides whether the order makes money, because the customer buys bags. The bridge between them is the weight of the bag, which is why bag costing always starts with weight and never with price.
Packaging costing is the same discipline applied across the pack: sacks, liners, BOPP laminates, stitched or pasted bottoms, and the printing on them. The lines change with the construction; the method does not.
The woven sack cost sheet, line by line
A complete bag cost sheet has three blocks — raw material, conversion, and what sits on top. Miss a block and the number is wrong in a direction you will not notice until the year-end.
1. Raw material
| Cost line | How the quantity is found | Applies to |
|---|---|---|
| PP / HDPE tape granule | Fabric area × fabric GSM, less the filler and masterbatch share | Every woven bag |
| Filler / CaCO₃ masterbatch | Its recipe percentage of the tape weight | Where the recipe allows it |
| Colour masterbatch / UV | Recipe percentage of the tape weight | Coloured or UV-stabilised fabric |
| Extrusion coating resin | Coated area × coating GSM | 2 Layer and above |
| BOPP film | Laminated area × (micron × 0.92) | 3 Layer BOPP |
| Metallised film | Laminated area × (micron × 0.92) | 4 Layer metallised |
| Lamination adhesive | Laminated area × adhesive GSM | Adhesive lamination |
| Printing ink and solvent | Printed area × coverage × ink GSM, per colour | Printed bags |
| Stitching thread | Stitch length × thread weight per metre | Stitched bags |
| Liner | Lay-flat width × cut length × gauge | Lined bags |
| Valve, patch, handle, label | Each part area × its own GSM | Block bottom, valve, handle bags |
Every one of these is a weight first and a rupee second. Get the weight wrong and no rate will save the costing — which is why the bag weight and costing calculator exists.
2. Conversion cost, process by process
Conversion is what it costs to run the material through your plant: power, manpower, machine hours, consumables and the overhead attached to each. It is carried per kilogram at each process, not as one factory-wide figure, because a plain stitched sack and a printed BOPP bag do not use the same machines.
| Process | Charged on | Typically carries |
|---|---|---|
| Tape extrusion | kg of tape produced | Power (the largest single line), extruder manpower, winder consumables |
| Weaving | kg of fabric woven | Loom hours, shuttle and reed wear, weaver wages |
| Extrusion coating / lamination | kg passed through the lamination line | Power, chill roll and die consumables, film handling |
| Printing | kg or impressions printed | Cylinder amortisation, make-ready waste, solvent recovery, operator |
| Cutting & stitching | bags produced | Machine hours, needle and thread consumables, operator per shift |
| Bottom pasting (block bottom) | bags produced | Pasting line hours, glue, patch handling |
| Baling & packing | bags or bales | Bale press, strap, packing labour |
3. What sits on top
- Process waste — start-up, edge trim, print make-ready, rejected bags. Scrap is bought and paid for, so waste belongs inside the cost, not in a contingency at the end.
- Factory overhead — rent, supervision, maintenance, quality; usually apportioned per kilogram of saleable output.
- Freight and packing to the customer, where the quotation is delivered rather than ex-works.
- Finance and credit — 60 or 90 day terms on a resin-heavy product are a real cost of the order.
- Margin, applied last and applied knowingly.
Bag costing formula
This is the woven sack costing formula every bag costing software has to get right, whatever it looks like on the screen.
laminated GSM = fabric GSM + coating GSM + (micron × 0.92) + ink GSM
bag weight (g) = cut width × cut length ÷ 10,000 × laminated GSM + patches + valve + thread
kg per bag = bag weight ÷ 1000 × (1 + waste %)
material cost = Σ (each material kg × its effective rate)
conversion = Σ (kg at each process × that process rate per kg)
cost per bag = material + conversion + overhead + freight
selling price = cost per bag ÷ (1 − margin %) — margin on price, not on cost
A worked woven sack cost sheet
A 3 Layer BOPP laminated sack, 50 × 90 cm lay-flat, 10 × 10 mesh at 900 denier, 18 GSM extrusion coating, 18 micron BOPP, printed one side, single fold and single hamming. Cut length works out at 96.5 cm and tube width at 100 cm, giving 0.9650 m² of fabric per bag. Enter that specification in the calculator on this site and it returns this bag — the finished weight below is the calculator's own figure.
| Cost sheet line | g / bag | Share | Priced at |
|---|---|---|---|
| Woven fabric — 78.7 GSM × 0.9650 m² | 75.95 | 67.1% | Granule + masterbatch, blended to the recipe |
| Extrusion coating resin — 18 GSM, both sides | 17.72 | 15.7% | Coating grade resin |
| BOPP film — 18 µm × 0.92 = 16.6 GSM | 16.30 | 14.4% | Film rate, per micron and width |
| Printing ink — 1.5 GSM, one side | 1.48 | 1.3% | Per colour, from coverage |
| Stitching thread | 1.67 | 1.5% | Thread rate per kg |
| Finished bag weight | 113.12 | 100% | — |
| Process waste — bought, never sold | 3.39 | — | Your own figure, per process |
| Raw material one bag actually consumes | 116.51 | — | × each rate = material cost |
| Conversion cost | — | — | Per kg at each process the bag visits |
| Factory overhead | — | — | Per kg of saleable output |
The finished bag weight is yours to read. The gram and share against each part, and the waste each process adds, are blurred on purpose — that break-up, and the formula behind every value, is what Nexora Sales & Costing is for. .
What that table tells you before any rate is applied
- The woven fabric dwarfs every other line. A GSM argument is a cost argument; an argument about the ink rate is not.
- Coating and film weigh more than their GSM suggests, because both run 10 mm wider than the body — a small percentage on the two most expensive lines in the bag.
- Waste is raw material bought and never sold. It is small per bag and large per order, and it differs by process — which is why one flat percentage across the whole bag under-costs a printed laminate.
- Five grams of specification is about half a tonne of extra raw material on an order of 1,00,000 bags — before anyone argues about a rate.
Where spreadsheet bag costing goes wrong
Almost every plant starts with an Excel bag costing sheet, and it works until it quietly does not. The failures are consistent:
| What happens | What it costs you |
|---|---|
| Rates are typed in and never dated | Nobody can say what rate an approved quotation was costed at, so a resin move silently rewrites old numbers |
| One flat waste percentage for the whole bag | Printing and lamination waste far more than weaving, so a printed BOPP bag is under-costed and a plain sack over-costed |
| One blended conversion cost per kg | A bag that skips lamination still carries lamination cost — you lose the plain-sack orders you should win |
| Component weights entered by hand | Patch, valve, ink and thread get rounded or forgotten; the error is small per bag and large per order |
| The sheet is copied per enquiry | Twenty versions of the truth, each with a different constant, none of them auditable |
| No link from costing to the BOM | Purchase orders and production plans are re-keyed from the quote, and drift from it |
Bag costing by construction
Which cost lines apply is decided by the construction, not by preference. The calculator only asks for the layers a construction actually has.
| Construction | Material lines it carries | Calculate it |
|---|---|---|
| 1 Layer — plain woven sack | Fabric, thread | 1 Layer stitched |
| 2 Layer — coated sack | Fabric, coating, thread | 2 Layer stitched |
| 3 Layer — BOPP laminated | Fabric, coating, BOPP film, ink, thread | BOPP bag calculation |
| 4 Layer — metallised | Fabric, coating, BOPP, metallised film, adhesive, ink | 4 Layer BOPP |
| Block bottom / valve | All of the above, plus patches, valve and pasting | Block bottom bag calculation |
| Lined bag | The bag lines, plus the liner as its own article | LDPE liner weight |
What bag costing software has to do
A calculator answers one question. A bag costing system has to hold the answer together across a year of price moves and a hundred enquiries. In practice that means:
- Weight from specification, not from memory — component-wise, with the formula visible against every intermediate value.
- A dated price master — every rate a version with an effective-from date, so an approved costing keeps the rate it was costed at.
- Process-wise conversion cost and process-wise waste, so each construction is charged only for the machines it touches.
- Cost per bag and cost per kilogram side by side, always both, never one.
- A costed BOM that becomes the production BOM, so nothing is re-keyed between quotation and shop-floor.
- An order-level forecast — the kilograms of each material an order will consume, before it is accepted.
- Confidentiality — rates are the most sensitive number in the plant and should be visible by role.
That is what Nexora Sales & Costing, our bag costing software, does, across 29 bag constructions, offline on a shop-floor PC, with a 3D view of the structure and an ink assumption model for printed work. The free bag costing calculator on this site runs the same geometry on example rates so you can see the method before you see the software.
Frequently asked questions about bag costing
The cost sheet
What is a bag costing cost sheet?
A cost sheet is the one page that shows how a bag's price was built: every raw material with its weight and rate, every process with the kilograms passing through it and its rate per kilogram, then waste, overhead, freight and margin. Its purpose is not the total at the bottom — it is that any line can be questioned. A quotation without a cost sheet behind it is a guess with a decimal point.
How do I cost a woven sack step by step?
Five steps. One, fix the specification — size, mesh, denier or GSM, coating, film micron, print, bottom type. Two, turn the specification into the weight of each component. Three, add process waste to get the kilograms one bag consumes. Four, multiply each material by its dated rate and add the conversion cost of each process the bag actually visits. Five, add overhead and freight, then apply margin on selling price. The bag costing calculator does steps one to three for you.
What is the difference between bag costing and packaging costing?
Bag costing is one article. Packaging costing is the whole pack — the sack, its liner, the label, the print, and sometimes the bale and the pallet the bags ship on. The method is identical; packaging costing just has more articles and usually a customer-specific combination of them, which is why it belongs in a costed Bill of Materials rather than in a single sheet.
How do I add factory overhead to a bag cost?
Apportion it per kilogram of saleable output, not per bag and not as a percentage of material. Total the overheads that are not already inside a process rate — rent, supervision, quality, general maintenance — and divide by the kilograms you actually sell in a normal month. A percentage of material cost moves the overhead every time resin moves, which is the wrong behaviour.
Should margin be calculated on cost or on selling price?
On selling price. Cost ÷ (1 − margin %) gives the price that leaves you the margin you intended. Adding a percentage to cost gives a smaller margin than the number suggests — add 20% to cost and you have earned 16.7% of the price, not 20%. On a high-volume, thin-margin product that difference is most of the profit.
How do I include freight in a bag quotation?
Work it per bag, not per consignment. Bags per bale, bales per truck and the truck rate to that destination give a rupee-per-bag freight that can sit as a line in the cost sheet. Quoting ex-works and absorbing freight later is how a profitable order becomes a break-even one on a long haul.
Rates, waste and recosting
What is an effective raw material rate?
The rate a material actually costs you once everything around the invoice is accounted for: the basic rate, less any discount, plus inward freight and handling, and with recycled or reprocessed content blended in at its own rate. Costing on the printed invoice rate alone is optimistic by exactly the amount you spend getting the material into the plant.
How do I recost quotations when the resin price changes?
Do not recost the approved ones. An approved quotation must keep the rate it was costed at, or you lose the ability to explain a price to a customer or to yourself. Instead give every rate an effective-from date, so new calculations pick up the new rate automatically while old ones stay intact, and run a comparison to see which live quotations are now below cost.
How does process waste differ from one process to another?
Considerably, which is why one flat figure misleads. Extrusion and weaving waste comes from start-up and edge trim and is usually low. Lamination adds its own start-up and joint loss. Printing is the heaviest, because make-ready, colour matching and cylinder changes scrap finished laminate — the most expensive material in the bag. Cost each process with its own waste and a printed BOPP bag stops looking cheaper than it is.
How do I cost the ink on a printed bag?
From coverage, not from a flat allowance. Each colour covers a percentage of the printed area, and ink laid down per square metre depends on that coverage, the substrate and how much solid white is behind it. Multiply area by coverage by the ink laid down, per colour, then add solvent. Nexora has an ink assumption model that reads coverage from the artwork itself and reports how confident it is — see the ink assumption module.
How do I cost a bag with a liner?
As two articles in one Bill of Materials. The liner has its own lay-flat width, cut length, micron or gauge, its own material rate and its own conversion, and it is inserted as a separate operation with its own labour. Use the LDPE liner weight calculator for the liner weight, then add it as a line in the bag's cost sheet.
Does scrap or reprocessed material reduce the cost of a bag?
It reduces the rate, not the weight, and only up to the percentage your recipe and your customer allow. Cost it honestly: the blended rate is the virgin rate and the reprocessed rate weighted by the recipe, and the recipe has to be the one the plant actually runs, not the one the costing sheet assumes.
Tools and software
Can I do bag costing in Excel?
You can, and most plants start there. It holds up while one person owns the sheet and rates are stable. It stops holding up when rates need dates, when each enquiry spawns a copy, when waste has to differ by process, and when the costing has to become a purchase plan. At that point the spreadsheet is no longer a calculation, it is six versions of one.
Is there free bag costing software?
The calculators on this site are free and need no sign-up — the bag costing calculator gives you the weight and shows how the cost is built from example rates. What free tools do not give you is the part that makes costing reliable over a year: your own dated rates, process-wise conversion, component-wise weights, and a costed BOM that carries into production. That is what the desktop app is for.
How accurate is a bag costing calculator compared with a plant costing?
The weight is close, because geometry is geometry. The money is indicative, because it runs on example rates and common defaults for fold, patch, valve, waste and conversion. A calculator is the right tool to check a quotation or catch a mistake. A quotation you will be held to should run on your own constants, your own dated rates and your own process costs.
Why are the costing figures on this site blurred?
The bag weight is yours to read freely. The money and the component-wise break-up are shown on request, because those figures depend on rates and process costs that have to be set up properly to mean anything. Request a demo and we will run your own specification with your own rates.
Does bag costing connect to purchase and production?
It should. The costing already knows the kilograms of every material one bag consumes, so multiplying by the order quantity gives the purchase requirement without anybody re-keying it. In Nexora the costed Bill of Materials becomes the production BOM, and the order forecast gives the raw material an order will need before it is accepted.
Who in a woven sack plant should own bag costing?
Whoever is accountable for margin, with the technical team owning the specification. In practice costing sits between sales and production and belongs to neither, which is why it drifts. Putting the constants, the rates and the constructions in one system with roles and approvals is what stops each department carrying its own version of the truth.
Cost your own bag, on your own rates
Send one specification sheet and get the full component-wise weight and cost break-up back within one business day.